The cost of construction and installation works during the month increased by 0.5%.

According to the State statistics service, the prices for construction-Assembly works (CAW) in Ukraine in September 2019 compared to August of the current year increased by 0.5%.
Most have increased prices for construction and Assembly works in construction of complex industrial structures – by 6.8%. At the same time the greatest reduction in the cost of construction and installation works in the field of other engineering structures – 1.6%.
Thus, according to the state statistics service, the price of SMR in January-September of 2019, compared to the same period in 2018, increased by 7.8%. Increased prices for construction-Assembly works in the field of construction of transport facilities – by 12.8%. Less likely increased the cost of the CMP pipelines, communication and power lines– 5.7%.
The data do not take into account the temporarily occupied territory of the Autonomous Republic of Crimea, Sevastopol and part of the zone of Operations of the joint forces.